Project Overview
A heavy civil engineering stabilization project focused on constructing high-durability reinforced concrete retaining walls to prevent soil erosion, stabilize embankment slopes, and safeguard surrounding transit channels around the Mile 2 axis.
Scope of Work
- Geotechnical site investigations, deep foundation piling, and excavation work.
- Reinforced concrete footings and structural wall casting to withstand lateral earth pressure.
- Backfilling with engineered granular materials and structural drainage integration.
- Installation of erosion barriers and surface runoff channels along the wall perimeter.
Key Highlights & Outcomes
- Stabilized critical embankment zones to support heavy transit loads.
- Engineered structural defense to mitigate soil erosion during heavy rains.
- Successfully delivered within the target 12-month timeframe.