Project Overview

A heavy civil engineering stabilization project focused on constructing high-durability reinforced concrete retaining walls to prevent soil erosion, stabilize embankment slopes, and safeguard surrounding transit channels around the Mile 2 axis.

Scope of Work

  • Geotechnical site investigations, deep foundation piling, and excavation work.
  • Reinforced concrete footings and structural wall casting to withstand lateral earth pressure.
  • Backfilling with engineered granular materials and structural drainage integration.
  • Installation of erosion barriers and surface runoff channels along the wall perimeter.

Key Highlights & Outcomes

  • Stabilized critical embankment zones to support heavy transit loads.
  • Engineered structural defense to mitigate soil erosion during heavy rains.
  • Successfully delivered within the target 12-month timeframe.