Project Overview
A key flood-mitigation civil engineering initiative involving the construction of a 2-kilometer reinforced concrete drainage channel to prevent seasonal waterlogging and protect critical road infrastructure along the Ikorodu–Ibeshe corridor.
Scope of Work
- Excavation and alignment of 2,000 meters of channel path.
- In-situ casting of reinforced concrete box and U-channel drains.
- Installation of heavy-duty culvert crossings and access covers.
- Outfall channel construction to ensure efficient rainwater discharge into natural waterways.
Key Highlights & Outcomes
- Mitigated persistent seasonal flooding for surrounding communities and businesses.
- Extended the operational lifespan of the adjacent asphalt carriageway.
- Completed within the scheduled 12-month delivery timeline.
Project Gallery